The document describes how the noise level was measured on the facade of a multi-storey residential building in Tashkent. The building has two sides parallel to the railway located about 25 m from it. Because of the short distance the noise level of trains is well above the permissible limit on the facade of the building, the objective of the acoustic study presented in the document was to ensure that the noise level measured at a distance of 2 m from the facade of the building, It was in compliance with the noise insulation standards of Uzbekistan and SP 353.1325800.2017, which fully comply with international standards. [1]
В последнее время на территории Узбекистана происходят события, которые будоражат общественное мнение, подрывают авторитет строительной отрасли и доверие к продуктам её деятельности, - обрушение части 6-этажного строящегося жилого дома в г. Джизак (2021 г.), прорыв дамбы Сардобинского водохранилища (2020 г.), незапланированная осадка 9-ти этажного жилого дома в г. Чирчик (2023 г.), появившиеся трещины в строящемся жилом многоэтажном доме в Ссргслийском районе (2023 г.) и в новостройке Яшнабадского района столицы (2023 г.), обрушение пяти балок строящегося путепровода перед международным аэропортом Ташкента (2023 г.). И это - нс полный список «побед», а только часть, получившая широкое освещение в социальных сетях.
In this article the procedural aspects of the appointment of forensic examination, the provision of electronic evidence before initiate case, as well as the specific features of the application for the provision of electronic evidence and the court's decision to appoint a forensic expert examination of electronic evidence were covered.